Loading...
Project Location        
Sakarya / Merkez
Year of Construction
Ongoing - 2025
Project Work Group
Transportatıon
Project Category
Raılways

Work Title

TÜRESAŞ Final Assembly Plant Entrance Lines Infrastructure, Superstructure, and Electrification Works

Employer

TÜRESAŞ

Actual Status

Ongoing
Job Identifler
Project Location        Sakarya / Merkez
Project Work Group Transportatıon
Project Category Railways
ProJect Scope Of Bid Offer Unıt Prıce

The employer of the project, for which the contract was signed on [.................], is the Turkish Rail System Corporation (TÜRASAŞ).

Project Information
Date Of Contract .....................
Date Of Completion Ongoing
Completion Time Ongoing
Total Length Of Road 8.5 Km

The approach network connecting the final assembly and testing facility—used in high-speed train and wagon production—to the main line includes five separate tracks, each approximately 800 meters in length, one main track measuring 5 kilometers, and five main railway switches (turnouts).