Project Location        
Konya / Türkiye
Year of Construction
2018-2016
Project Work Group
Transportation
Project Category
Viaducts

Work Title

Altınapa Dam Bridge

Employer

Highways Konya 3 Rd Regional Directorate

Actual Status

Completed
Job Identifler
Project Location        Konya / Türkiye
Project Work Group Transportation
Project Category Viaducts
ProJect Scope Of Bid Offer Unit Price

Employer of the project whose contract was signed on 10.10.2016 is the 3rd Reigonal Directrote of Highways in Konya. The bridge has a length of 300 meters and includes 6 vertical columns. The bridge, which is 28 meters heigh from the ground has 2 lanes for each direction.

Project Information
Date Of Contract 10.10.2016
Date Of Completion 25.09.2018
Completion Time 715 Day
Total Bridge Length 300 Mt

Within the scope of the project, ammunition and weapons that are in the inventory of the Ministry of National Defense and the Turkish Armed Forces and that will be included in the inventory are preserved.